
PROJECT PROFILE: HARRY LEE HALL
Architects charged with overseeing the preservation of the exterior envelope of this stately structure located on the Quantico Marine base needed accurate drawings that describe the extent and character of the surfaces that compose the buildingís multiple facades. Using photogrammetry to create both a set of precise CAD line drawings and a series of rectified photographs that correspond directly to the drawings, Aaslestad Preservation Consulting provided the architects with the documentation required for swift progress on this project.

[Rollover red square to enlarge each image] |